We opposed waste incinerator because it may affects all Malaysian and not only residents of Rawang.
1. The building cost billions of ringgit that may only used for 10-13 years.
2. The billions of ringgits to maintain yearly.
3. It is not the cheapest way to provide energy.
4. Not helping on global warming.
5. The poison gas/solid waste it will produced that causes health issues. This is due to the our waste is not properly separated before incinerate. Especially plastics.
Note: Hi-tech country like Japan and Europeans country strongly promote waste separation before incinerate. Some country like Japan even export their plastics waste to other country like us.
Selayang MP William Leong today questioned the risks of having two waste-to-energy (WTE) incinerators operating simultaneously within a 15km radius in Rawang.
The first incinerator is the proposed Sultan Idris Shah (SIS) WTE Green Energy Plant under the purview of the Selangor state government.
The second is the relocated WTE incinerator by the Housing and Local Government Ministry which was initially planned to be built at Taman Beringin, Kepong, and was later moved to Rawang.
Ucapan YB William Leong, Ahli Parlimen Selayang di ceramah "Impak Insinerator kepada Program Heritage & Geopark" yang berlangsung 10 pagi pada 27 Ogos 2023 di Galeri Batu Arang.
雪州万挠区州议员蔡伟杰于8月17 日上爱FM 《YB 来聊》节目 接受采访。此视频节录 蔡议员针对 万挠垃圾焚化炉的看法与立场。
简单来讲,热处理还是最快的塑料处理方法。 但是热处理也有分为两个主要的种类,第一个为对环境造成更多问题的焚化方式,第二个为较为安全的裂解方式。 裂解方式好处是它只是需要用到430-500°C就可以把塑料完全裂解成燃油跟炭灰。如果垃圾里的塑料掺杂着其它的废物如金属或无机化合物,这些物质就会跟着炭灰一起出来然后再进行分解就可以了。 炭灰是可以用来制造轮胎或用在稳定土壤上而有些无机化合物是化肥来的。